MMOLLogistics Netherlands B.V.
Heavy Haul Transport - Heavy Haul

About Us

To move the largest and most valuable equipment on the road with disciplined planning, compliant permitting and drivers who treat every load as if their own name were on the cargo.

Who We Are

About Our Company

MOL Logistics Netherlands B.V. is a specialized heavy haul carrier moving oversize, overweight and high-value project cargo for contractors, manufacturers and energy developers. Our work starts long before a truck is dispatched: load dimensions and weights are verified, axle configurations are calculated against bridge and axle-group limits, and a route survey identifies low wires, tight turns, construction zones and weight-restricted structures. Permits are filed by our in-house desk, escorts are scheduled, and a written move plan goes to the driver and your project manager. The result is fewer surprises on the road and a delivery you can plan a crane crew around.

Based in Tilburg, MOL Logistics Netherlands B.V. runs a fleet of lowboys, removable gooseneck trailers, extendable stretch units and multi-axle configurations backed by drivers who have years of experience with wide and heavy freight. We keep our own equipment maintained, hold the cargo and liability coverage that project owners require, and train every driver in load securement, permit compliance and pilot car coordination. Whether the freight is a single dozer or a multi-day superload convoy, we apply the same discipline: verify the details, plan the route, communicate early and protect the cargo from first chain to last binder.

Heavy Haul Transport - Highway

Core Capabilities

  • Documentation is retained for the full period the contract and statute require.
  • Public separation and traffic management are planned before equipment arrives.
  • Equipment calibration and maintenance records are kept current and auditable.
  • Corrective actions address the cause, not just the instance.
  • Training and credential renewals are tracked centrally, not left to individuals.
  • Near-miss reporting is encouraged and never used punitively.

Our Mission

To give project owners a heavy haul partner who plans for obstacles in advance, communicates clearly while the load is moving and delivers on the date the schedule depends on.

Track Record

By The Numbers

48States Permitted & Routed
5,000+Oversize Loads Delivered
98%On-Time Delivery Rate
24/7Dispatch & Permit Support

Our Advantages

Why Clients Choose Us

In-House Permit Desk

Permits are prepared by people who handle them every day, not outsourced to a broker queue. That means faster corrections, accurate axle data and fewer pickup dates lost to application errors.

Insurance Built For High Value

Cargo and liability coverage is structured for project-scale freight, and certificates are issued to owners, general contractors and site operators quickly when the contract requires them.

Trailers Matched To The Cargo

Our fleet covers lowboys, RGNs, stretch trailers and multi-axle units, so the equipment is chosen for the freight and not the other way around. Weight distribution drives the configuration.

Written Move Plans

Each non-routine move has a plan covering route, restrictions, escort positions, stop locations and contingency options. The driver, escorts and your project team all work from the same document.

Drivers Trained For Wide Loads

Oversize driving is a different skill from general freight. Our drivers train on securement, permit conditions, escort communication and tight-turn techniques before they run a wide load alone.

Live Dispatch Visibility

Your team can see where the load is and what is next. Dispatch calls ahead about delays, detours and weather holds, so site crews and cranes are never left waiting without information.

Annual Program Review

Each term closes with a condition review and recommendations, so the next contract reflects how the site actually performed.

Subcontractor Discipline

Where specialist trades are engaged, they work to our safety and documentation standards and we remain the single accountable party.

Standards Alignment

Methods are mapped to recognized standards and codes, and we tell you plainly where a specification needs to be tightened.

Compliance

Standards & Credentials

  • USDOT & FMCSA Operating Authority
  • Oversize & Overweight Permit Compliance
  • Federal Cargo Securement Standards
  • Certified Pilot Car Escort Coordination
  • Drug & Alcohol Testing Program
  • Cargo & General Liability Coverage

Current certificates of insurance and credential documentation are provided with every proposal.

Sectors

Who We Serve

Prevailing wage, certified payroll and local hiring reporting are handled in-house.

  • General Contractors
  • Equipment Dealers
  • Utilities & Power Developers
  • Wind & Solar Developers
  • Manufacturers
  • Rental Fleets
  • Mining & Quarry Operators
  • Government Agencies

Client Feedback

What Clients Say

We had a transformer that had to arrive on a fixed outage date. Their team found a bridge restriction we had not known about, rerouted early and delivered on schedule. That kind of planning is why we call them first.
T
T. HargroveProject Manager, Electrical Contractor
Moving a crane in six loads across three states is a coordination problem, not just a trucking problem. Permits, escorts and arrival order were managed so our assembly crew never waited a single hour.
L
L. BrandtOperations Director, Heavy Civil Contractor
Our rental branches move machines every day, and the difference with this carrier is communication. We know when the unit is picked up, where it is and when it arrives, with no chasing required.
K
K. VillanuevaFleet Manager, Equipment Rental Company

Have A Load That Will Not Fit The Rules?

Send MOL Logistics Netherlands B.V. your dimensions, weight and route and we will return a trailer recommendation, permit outlook and realistic timeline.

Heavy Haul Transport - Fleet Yard

Services

Our permit desk files oversize and overweight applications in every state on your lane, runs route surveys for height, width and bridge limits, and builds a move plan that clears inspection before the wheels turn.

Our Services

What We Do

Loading, Securement & Site Delivery
Step 01

Loading, Securement & Site Delivery

Qualified crews supervise loading, blocking, chaining and strapping, protecting finished surfaces, hydraulics and sensitive components with proper dunnage and edge protection. At destination, we coordinate with the receiving crane or rigging contractor, confirm the staging area and ground conditions, and complete a delivery inspection with signed condition notes.

Request a Quote
Construction & Mining Equipment Transport
Step 02

Construction & Mining Equipment Transport

Regular and on-demand hauling of excavators, dozers, cranes, graders, haul trucks and attachments between yards, rental branches, quarries and job sites. We understand that boom, counterweight and track removal can bring a unit under a permit threshold, and we coordinate with your mechanics so disassembly and reassembly are planned instead of improvised at the dock.

Request a Quote
Oversize & Overweight Hauling
Step 03

Oversize & Overweight Hauling

Single-piece and multi-piece moves of equipment and fabricated components that exceed legal dimensions or weights. We match the trailer to the cargo, from standard lowboys to multi-axle configurations that spread load across more axle groups, and we verify height, width, length and gross weight before any permit application is filed. Securement follows DOT cargo rules and manufacturer lashing points.

Request a Quote
Pilot Car & Escort Coordination
Step 04

Pilot Car & Escort Coordination

We schedule certified front and rear pilot cars, height pole vehicles and, where states require them, law enforcement escorts. Escort operators are briefed on the move plan, radio protocol and stopping locations, and escort requirements are matched to the permit rather than negotiated at the roadside. That keeps wide loads moving within the conditions regulators set.

Request a Quote
Power & Energy Equipment Moves
Step 05

Power & Energy Equipment Moves

Transport of transformers, switchgear, generators, turbine components and wind tower or blade sections to substations, plants and project sites. These moves often involve extreme weight, special trailers, utility line lifts and tight delivery windows, so we plan with the owner's engineers on center of gravity, tie-down design, shock limits and the receiving crew's unloading plan.

Request a Quote
State Permitting & Compliance
Step 06

State Permitting & Compliance

Our permit desk files single-trip and annual oversize and overweight permits across every state on your lane, tracking each jurisdiction's dimensional limits, travel-time restrictions, holiday blackouts, weekend rules and escort requirements. Applications include axle weights and spacing, and we handle the revisions that state permit offices commonly request so approvals do not hold up your pickup date.

Request a Quote
Route Surveys & Move Planning
Step 07

Route Surveys & Move Planning

Before a wide or tall load rolls, we survey the planned route for overhead obstructions, bridge clearances, turning radius problems, utility lines, lane restrictions and active construction. Surveys can be desk-based using state restriction data or physical drive-throughs with height poles for critical moves, and results feed a written move plan with alternates for each trouble spot.

Request a Quote
Multi-Axle & Superload Coordination
Step 08

Multi-Axle & Superload Coordination

For loads that exceed ordinary permit categories, we prepare the engineering submissions that state bridge and structures offices review, including axle configuration drawings, bridge analysis data and proposed routing. We coordinate multi-day schedules, lodging stops and escorts with agency staff so the superload clears review and travels under a plan every party understands.

Request a Quote

Our Process

How We Work

  1. 1

    Load Review & Quote

    You send dimensions, weight, drawings and lift points. We verify the numbers, identify the right trailer, flag permit categories and escort needs, and return a written proposal with the assumptions behind it.

  2. 2

    Route Survey & Permits

    Our team surveys the route, files permits in every state on the lane and books escorts. Any restriction that affects timing, such as travel windows or bridge limits, is communicated before the date is confirmed.

  3. 3

    Loading & Transit

    The load is secured under supervision, photographed and checked against the move plan. Dispatch monitors the trip, coordinates with escorts and updates your team at each state line and scheduled stop.

  4. 4

    Delivery & Documentation

    We coordinate unloading with your rigging crew, complete a condition inspection and provide delivery records, permit copies and photographs so your files and your insurer have a complete move history.

Our Advantages

Why Clients Choose Us

In-House Permit Desk

Permits are prepared by people who handle them every day, not outsourced to a broker queue. That means faster corrections, accurate axle data and fewer pickup dates lost to application errors.

Insurance Built For High Value

Cargo and liability coverage is structured for project-scale freight, and certificates are issued to owners, general contractors and site operators quickly when the contract requires them.

Trailers Matched To The Cargo

Our fleet covers lowboys, RGNs, stretch trailers and multi-axle units, so the equipment is chosen for the freight and not the other way around. Weight distribution drives the configuration.

Written Move Plans

Each non-routine move has a plan covering route, restrictions, escort positions, stop locations and contingency options. The driver, escorts and your project team all work from the same document.

Drivers Trained For Wide Loads

Oversize driving is a different skill from general freight. Our drivers train on securement, permit conditions, escort communication and tight-turn techniques before they run a wide load alone.

Live Dispatch Visibility

Your team can see where the load is and what is next. Dispatch calls ahead about delays, detours and weather holds, so site crews and cranes are never left waiting without information.

Annual Program Review

Each term closes with a condition review and recommendations, so the next contract reflects how the site actually performed.

Subcontractor Discipline

Where specialist trades are engaged, they work to our safety and documentation standards and we remain the single accountable party.

Standards Alignment

Methods are mapped to recognized standards and codes, and we tell you plainly where a specification needs to be tightened.

Questions & Answers

Frequently Asked Questions

We can mobilize most maintenance programs within two weeks of award.

Read More

Often, yes. Removing booms, counterweights, tracks, buckets or cabs can reduce width, height or weight below a threshold. We discuss options with your mechanics, weigh the labor against permit time and cost, and plan reassembly at the destination.

As early as the project allows. Simple permits can be issued quickly, but superloads, multi-state routes and moves needing utility lifts or bridge review take longer. Sharing dimensions and drawings during planning lets us identify long-lead items before the delivery date is fixed.

Yes. We coordinate front and rear pilot cars, height pole vehicles and law enforcement escorts when required. Escort numbers and positions follow permit conditions, and operators are briefed on the move plan, communication protocol and stopping points before the load leaves.

You receive a delivery receipt with condition notes, photographs from loading and unloading, copies of the permits used and any scale tickets. These records support insurance, equipment warranties and your project closeout file.

Have A Load That Will Not Fit The Rules?

Send MOL Logistics Netherlands B.V. your dimensions, weight and route and we will return a trailer recommendation, permit outlook and realistic timeline.

Heavy Haul Transport - Highway

Projects

Hydraulic platform trailers, multi-axle lowboys and removable gooseneck units are matched to axle loading and center of gravity, with securement designed to DOT cargo rules and the manufacturer's lifting and lashing points.

Projects & Case Studies

Selected Work

Quarry Fleet Relocation Program
Mining & Quarry

Quarry Fleet Relocation Program

Scheduled hauling of excavators, articulated haul trucks and crushing equipment between two quarry sites across a three-state corridor. Components were partially disassembled to meet permit thresholds, and move dates were sequenced so each site kept production running during the transfer.

Scope of Work
Heavy Haul Transport
Category
Mining & Quarry
Wind Project Component Logistics
Renewable Energy

Wind Project Component Logistics

Trucking of tower sections and nacelle components from port to a wind farm site over secondary highways. Our team performed a route survey, coordinated temporary sign and signal removals with local agencies and ran escorted convoys inside agency-approved travel windows.

Scope of Work
Heavy Haul Transport
Category
Renewable Energy
Substation Transformer Delivery
Power Equipment

Substation Transformer Delivery

Multi-axle hydraulic trailer move of a large power transformer from a rail transfer yard to a rural substation. The project required bridge analysis submissions, utility line lifts coordinated with the local utility, rolling road closures and a staged unloading plan with the owner's rigging contractor.

Scope of Work
Heavy Haul Transport
Category
Power Equipment
Crane Mobilization For Bridge Replacement
Infrastructure

Crane Mobilization For Bridge Replacement

Delivery of a crawler crane in multiple permitted loads, including counterweights and boom sections, to a riverside bridge replacement site. Staging, loading order and escort positions were planned in advance so crane assembly began on the date the contractor had set.

Scope of Work
Heavy Haul Transport
Category
Infrastructure

Track Record

By The Numbers

48States Permitted & Routed
5,000+Oversize Loads Delivered
98%On-Time Delivery Rate
24/7Dispatch & Permit Support

Client Feedback

What Clients Say

We had a transformer that had to arrive on a fixed outage date. Their team found a bridge restriction we had not known about, rerouted early and delivered on schedule. That kind of planning is why we call them first.
T
T. HargroveProject Manager, Electrical Contractor
Moving a crane in six loads across three states is a coordination problem, not just a trucking problem. Permits, escorts and arrival order were managed so our assembly crew never waited a single hour.
L
L. BrandtOperations Director, Heavy Civil Contractor
Our rental branches move machines every day, and the difference with this carrier is communication. We know when the unit is picked up, where it is and when it arrives, with no chasing required.
K
K. VillanuevaFleet Manager, Equipment Rental Company

Have A Load That Will Not Fit The Rules?

Send MOL Logistics Netherlands B.V. your dimensions, weight and route and we will return a trailer recommendation, permit outlook and realistic timeline.

Heavy Haul Transport - Fleet Yard

FAQ

We can mobilize most maintenance programs within two weeks of award.

Questions & Answers

Frequently Asked Questions

Often, yes. Removing booms, counterweights, tracks, buckets or cabs can reduce width, height or weight below a threshold. We discuss options with your mechanics, weigh the labor against permit time and cost, and plan reassembly at the destination.

As early as the project allows. Simple permits can be issued quickly, but superloads, multi-state routes and moves needing utility lifts or bridge review take longer. Sharing dimensions and drawings during planning lets us identify long-lead items before the delivery date is fixed.

Yes. We coordinate front and rear pilot cars, height pole vehicles and law enforcement escorts when required. Escort numbers and positions follow permit conditions, and operators are briefed on the move plan, communication protocol and stopping points before the load leaves.

You receive a delivery receipt with condition notes, photographs from loading and unloading, copies of the permits used and any scale tickets. These records support insurance, equipment warranties and your project closeout file.

We use chains, binders, straps and blocking rated for the load, applied to manufacturer tie-down points where available. Securement follows federal cargo securement rules, including working load limits and minimum tie-down counts, and drivers re-check the load early in the trip and at regular stops.

Each state sets legal limits for width, height, length and gross or axle weight, and a load that exceeds any of them needs a permit. Limits differ by state and road class, so we verify dimensions and axle weights first and then identify the permit category for each jurisdiction along the route.

Get In Touch

We reply to every inquiry during business hours. For urgent site issues, please call instead of using this form.

Contact Us
Heavy Haul Transport - Crane

Contact

We reply to every inquiry during business hours. For urgent site issues, please call instead of using this form.

Contact

Get In Touch

We can mobilize most maintenance programs within two weeks of award.

  • Office AddressSiriusstraat 45, 5015BT Tilburg, Netherlands
  • Telephone+31135373373
  • Business HoursMonday to Friday, 8:30 - 17:30
  • Emergency & After-Hours24/7 dispatch for contracted clients
  • Websiterotterdamcargoline.com

We reply to every inquiry during business hours. For urgent site issues, please call instead of using this form.

Image Credits

Photographs on this website are used under open licenses that permit commercial use.

The following images are published under Creative Commons licenses and are listed with their original title and attribution as given by the source.

  • File:Moscow, Prospect Mira 98 truck yard (19184033255).jpg"File:Moscow, Prospect Mira 98 truck yard (19184033255).jpg" by Gennady Grachev from Moscow, Russia is licensed under CC BY 2.0. To view a copy of this license, visit https://creativecommons.org/licenses/by/2.0/.
  • File:Crawler crane and tower cranes. lusail al thumama stadium - panoramio.jpg"File:Crawler crane and tower cranes. lusail al thumama stadium - panoramio.jpg" by Suresh Babunair is licensed under CC BY 3.0. To view a copy of this license, visit https://creativecommons.org/licenses/by/3.0/.
  • Accusteel Heavy Haul"Accusteel Heavy Haul" by Accusteel is licensed under CC BY-SA 4.0. To view a copy of this license, visit https://creativecommons.org/licenses/by-sa/4.0/.
  • Tower crane aerial 01"Tower crane aerial 01" by Wikideas1 is marked with CC0 1.0. To view the terms, visit https://creativecommons.org/publicdomain/zero/1.0/deed.en/.
  • Oregon - Columbia Gorge - The Historic Columbia River Highway - United States"Oregon - Columbia Gorge - The Historic Columbia River Highway - United States" by Onasill - Bill Badzo - 149 Million Views - Thank Y is marked with Public Domain Mark 1.0. To view the terms, visit https://creativecommons.org/publicdomain/m
  • Tower Crane on Austin High Rise 2020"Tower Crane on Austin High Rise 2020" by Larry D. Moore is licensed under CC BY-SA 4.0. To view a copy of this license, visit https://creativecommons.org/licenses/by-sa/4.0/.
  • Special heavy haul"Special heavy haul" by Ruiqianhe is licensed under CC BY-SA 3.0. To view a copy of this license, visit https://creativecommons.org/licenses/by-sa/3.0/.

18 further photographs are used under the Pixabay Content License, which permits commercial use and does not require attribution.

Contract Specialists

Every Permit, Route And Escort Handled

Our permit desk files oversize and overweight applications in every state on your lane, runs route surveys for height, width and bridge limits, and builds a move plan that clears inspection before the wheels turn.

  • Public Contracts
  • Emergency Response
  • 24/7 Dispatch
  • Year-Round Crews
Heavy Haul Transport services by MOL Logistics Netherlands B.V.
48States Permitted & Routed

A contractor your procurement team does not have to chase

  • USDOT & FMCSA Operating Authority
  • Oversize & Overweight Permit Compliance
  • Federal Cargo Securement Standards
  • Certified Pilot Car Escort Coordination
  • Drug & Alcohol Testing Program
Heavy Haul Transport - Heavy Haul
Heavy Haul Transport

Who We Are

About Our Company

MOL Logistics Netherlands B.V. is a specialized heavy haul carrier moving oversize, overweight and high-value project cargo for contractors, manufacturers and energy developers. Our work starts long before a truck is dispatched: load dimensions and weights are verified, axle configurations are calculated against bridge and axle-group limits, and a route survey identifies low wires, tight turns, construction zones and

  • Documentation is part of the work, not an afterthought.
  • Safety decisions are never traded against schedule.
  • If a schedule is going to slip, you hear it from us first.
  • Our crews are employees, and they are accountable to you through us.
Learn More

Our Services

What We Do

01

Loading, Securement & Site Delivery

Qualified crews supervise loading, blocking, chaining and strapping, protecting finished surfaces, hydraulics and sensitive components with proper dunnage and edge protection. At destination, we coordinate with

View Details
02

Construction & Mining Equipment Transport

Regular and on-demand hauling of excavators, dozers, cranes, graders, haul trucks and attachments between yards, rental branches, quarries and job sites. We understand that boom, counterweight and track removal

View Details
03

Oversize & Overweight Hauling

Single-piece and multi-piece moves of equipment and fabricated components that exceed legal dimensions or weights. We match the trailer to the cargo, from standard lowboys to multi-axle configurations that spre

View Details
04

Pilot Car & Escort Coordination

We schedule certified front and rear pilot cars, height pole vehicles and, where states require them, law enforcement escorts. Escort operators are briefed on the move plan, radio protocol and stopping location

View Details
05

Power & Energy Equipment Moves

Transport of transformers, switchgear, generators, turbine components and wind tower or blade sections to substations, plants and project sites. These moves often involve extreme weight, special trailers, utili

View Details
06

State Permitting & Compliance

Our permit desk files single-trip and annual oversize and overweight permits across every state on your lane, tracking each jurisdiction's dimensional limits, travel-time restrictions, holiday blackouts, weeken

View Details

Projects & Case Studies

Selected Work

Quarry Fleet Relocation ProgramMining & Quarry

Quarry Fleet Relocation Program

Scheduled hauling of excavators, articulated haul trucks and crushing equipment between two quarry sites across a three-state corridor. Components were partially disassembled to meet permit thresholds, and move dates were sequenced so each site kept production running during the transfer.

View Details
Wind Project Component LogisticsRenewable Energy

Wind Project Component Logistics

Trucking of tower sections and nacelle components from port to a wind farm site over secondary highways. Our team performed a route survey, coordinated temporary sign and signal removals with local agencies and ran escorted convoys inside agency-approved travel windows.

View Details
Substation Transformer DeliveryPower Equipment

Substation Transformer Delivery

Multi-axle hydraulic trailer move of a large power transformer from a rail transfer yard to a rural substation. The project required bridge analysis submissions, utility line lifts coordinated with the local utility, rolling road closures and a staged unloading plan with the owner's rigging contractor.

View Details
Crane Mobilization For Bridge ReplacementInfrastructure

Crane Mobilization For Bridge Replacement

Delivery of a crawler crane in multiple permitted loads, including counterweights and boom sections, to a riverside bridge replacement site. Staging, loading order and escort positions were planned in advance so crane assembly began on the date the contractor had set.

View Details

Track Record

By The Numbers

48States Permitted & Routed
5,000+Oversize Loads Delivered
98%On-Time Delivery Rate
24/7Dispatch & Permit Support

Our Advantages

Why Clients Choose Us

In-House Permit Desk

Permits are prepared by people who handle them every day, not outsourced to a broker queue. That means faster corrections, accurate axle data and fewer pickup dates lost to application errors.

Insurance Built For High Value

Cargo and liability coverage is structured for project-scale freight, and certificates are issued to owners, general contractors and site operators quickly when the contract requires them.

Trailers Matched To The Cargo

Our fleet covers lowboys, RGNs, stretch trailers and multi-axle units, so the equipment is chosen for the freight and not the other way around. Weight distribution drives the configuration.

Written Move Plans

Each non-routine move has a plan covering route, restrictions, escort positions, stop locations and contingency options. The driver, escorts and your project team all work from the same document.

Drivers Trained For Wide Loads

Oversize driving is a different skill from general freight. Our drivers train on securement, permit conditions, escort communication and tight-turn techniques before they run a wide load alone.

Live Dispatch Visibility

Your team can see where the load is and what is next. Dispatch calls ahead about delays, detours and weather holds, so site crews and cranes are never left waiting without information.

Annual Program Review

Each term closes with a condition review and recommendations, so the next contract reflects how the site actually performed.

Subcontractor Discipline

Where specialist trades are engaged, they work to our safety and documentation standards and we remain the single accountable party.

Standards Alignment

Methods are mapped to recognized standards and codes, and we tell you plainly where a specification needs to be tightened.

Sectors

Who We Serve

Prevailing wage, certified payroll and local hiring reporting are handled in-house.

  • General Contractors
  • Equipment Dealers
  • Utilities & Power Developers
  • Wind & Solar Developers
  • Manufacturers
  • Rental Fleets
  • Mining & Quarry Operators
  • Government Agencies

Client Feedback

What Clients Say

We had a transformer that had to arrive on a fixed outage date. Their team found a bridge restriction we had not known about, rerouted early and delivered on schedule. That kind of planning is why we call them first.
T
T. HargroveProject Manager, Electrical Contractor
Moving a crane in six loads across three states is a coordination problem, not just a trucking problem. Permits, escorts and arrival order were managed so our assembly crew never waited a single hour.
L
L. BrandtOperations Director, Heavy Civil Contractor
Our rental branches move machines every day, and the difference with this carrier is communication. We know when the unit is picked up, where it is and when it arrives, with no chasing required.
K
K. VillanuevaFleet Manager, Equipment Rental Company

From Our Desk

Insights & Updates

Heavy Haul Transport - Heavy Haul

Travel Windows And Why Wide Loads Wait

Daylight-only rules, urban curfews and holiday blackouts shape oversize schedules more than mileage does. A practical guide to building realistic delivery dates.

Heavy Haul Transport - Highway

Why Records Matter More Than Promises

Timestamped service documentation answers audits, complaints and invoice questions without a meeting. A look at what good records contain.

Heavy Haul Transport - Fleet Yard

Pilot Car Positions On Two-Lane Roads

Escort placement changes by road type and load width. We outline how front and rear pilot cars work together to keep traffic informed and the load protected.

Heavy Haul Transport - Crane

Budgeting For The Full Asset Life

Capital cost is the small number. We walk through how to model maintenance, renewal and end-of-life into the original business case.

Have A Load That Will Not Fit The Rules?

Send MOL Logistics Netherlands B.V. your dimensions, weight and route and we will return a trailer recommendation, permit outlook and realistic timeline.